NewLean Factory Simulation
The lean dictionary brought to life — an e-bike plant at two altitudes, and eighteen terms you watch happen instead of read.
- Two layers
- Plant + line
- Terms shown
- 18
- Needs
- Desktop
NewThe lean dictionary brought to life — an e-bike plant at two altitudes, and eighteen terms you watch happen instead of read.

A clinic morning you re-run after changing the demand, the staffing or the sequence.

Two lines race to build 20 parts — one in batches, one piece at a time.

Find what you need in a workspace that fights you, then fix the workspace.




Split the work across stations so the line runs to customer demand.

Build a factory from an empty floor and find out what every choice cost you.

Batch size sets the lead time, and nothing else does.
20 coins · 5–6 people · 15–20 min

A perfectly balanced line still finishes below its own average.
Dice + ~40 tokens · 4–6 people · 20–25 min

Same crew, same planes — only the batch size changes.
~40 sheets · 5–7 people · 25–30 min

Three timed rounds that prove organisation is speed.
Printed sheets · any group · 10–15 min

Four businesses, four weeks of waiting, and a swing nobody meant to cause.
Printed sheets · 4 per team · 2 hr