NewLean Factory Simulation
The lean dictionary brought to life — an e-bike plant at two altitudes, and eighteen terms you watch happen instead of read.
- Two layers
- Plant + line
- Terms shown
- 18
- Needs
- Desktop
13 of 13
NewThe lean dictionary brought to life — an e-bike plant at two altitudes, and eighteen terms you watch happen instead of read.

A clinic morning you re-run after changing the demand, the staffing or the sequence.

Two lines race to build 20 parts — one in batches, one piece at a time.
Find what you need in a workspace that fights you, then fix the workspace.

Split the work across stations so the line runs to customer demand.

Batch size sets the lead time, and nothing else does.
20 coins · 5–6 people · 15–20 min

A perfectly balanced line still finishes below its own average.
Dice + ~40 tokens · 4–6 people · 20–25 min

Same crew, same planes — only the batch size changes.
~40 sheets · 5–7 people · 25–30 min

Three timed rounds that prove organisation is speed.
Printed sheets · any group · 10–15 min

Four businesses, four weeks of waiting, and a swing nobody meant to cause.
Printed sheets · 4 per team · 2 hr