NewLean Factory Simulation
The lean dictionary brought to life — an e-bike plant at two altitudes, and eighteen terms you watch happen instead of read.
- Two layers
- Plant + line
- Terms shown
- 18
- Needs
- Desktop
NewThe lean dictionary brought to life — an e-bike plant at two altitudes, and eighteen terms you watch happen instead of read.

A clinic morning you re-run after changing the demand, the staffing or the sequence.

Two lines race to build 20 parts — one in batches, one piece at a time.

Find what you need in a workspace that fights you, then fix the workspace.



Catch mistakes where they start, then change the step so they stop.

Build a team board, then see which problems it shows the day they start.


Split the work across stations so the line runs to customer demand.

Fill in the three standardized work sheets for one machining cell.

Build a factory from an empty floor and find out what every choice cost you.

Batch size sets the lead time, and nothing else does.
20 coins · 5–6 people · 15–20 min

A perfectly balanced line still finishes below its own average.
Dice + ~40 tokens · 4–6 people · 20–25 min

Same crew, same planes — only the batch size changes.
~40 sheets · 5–7 people · 25–30 min

Three timed rounds that prove organisation is speed.
Printed sheets · any group · 10–15 min

Four businesses, four weeks of waiting, and a swing nobody meant to cause.
Printed sheets · 4 per team · 2 hr