EPEI Calculator

Every Part Every Interval scheduling

1/3

What EPEI Means

Every Part Every Interval estimates how often a mixed-model process can cycle through every part in the family without exceeding available capacity.

Example
EPEI interval
0.69days
90 ÷ 131.3 min
Daily run time
288.7min
Σ Run min / day
Setup capacity per day
131.3min
420 − 288.7 min
Run utilization
68.7%
288.7 ÷ 420 min
Run min / day84.0
Lot per EPEI82
Run min / day73.3
Lot per EPEI55
Run min / day68.0
Lot per EPEI41
Run min / day63.3
Lot per EPEI27

Everything is editable — click any field.

Want an editable copy?

Download the free EPEI (Every Part Every Interval) template — enter your part family's demand, cycle, and changeover times and it calculates run utilization and your EPEI interval. Opens in Excel and Google Sheets.

What is EPEI?

EPEI means Every Part Every Interval. It estimates how frequently a mixed-model process can produce every item in a part family while respecting available capacity, daily demand, run time, and setup time.

A shorter EPEI supports smaller lots, lower inventory, and faster replenishment. If the interval is too long, use the SMED Changeover Calculator to test setup reduction and the Kanban Card Calculator to size the replenishment loop.

Related tools