Lean Factory Simulation
A running model of an e-bike plant. It starts as a batch plant: four separate stations, pallets of parts brought by forklift, and a shift schedule that builds one color at a time. Three switches change it, and you can turn them on in any order.
Three changes, one plant
Flow cell moves the four stations into a U so operators can share the work. Timed route puts two small bins of parts at every station and sends a tugger around every 20 minutes to swap the empty ones. Level pull replaces the shift schedule with a heijunka box that releases one lot of 10 bikes every 10 minutes, and the paint booth paints a color only when that row of frames sends its card.
No single switch does much on its own. With all three on, the cell runs with 2 operators instead of 4, every truck leaves full, and the lead time from paint to truck falls from about five hours to about three.
The numbers it runs on
The shift is 440 minutes and dealers need 440 bikes, so takt time is 60 seconds. A lot is 10 bikes, so pitch is 10 minutes. The paint booth takes 20 seconds a frame. Changing color takes 30 minutes on the shift schedule and 5 minutes with level pull. A truck leaves every 30 minutes.
Click an operator to open their standardized work combination table and work chart. Click the painter to open the booth’s process capacity sheet. The documents update when you change the plant.
Terms you can watch happen
- Takt time — a board above the line that adds one bike to the plan every 60 seconds
- Cycle time — a clock above one operator that counts each step
- Standardized work — the same steps in the same order, with the combination table open beside the operator
- Yamazumi chart — each operator’s time stacked against takt time
- Waste — operators walking to a pallet and searching it, 82 seconds a bike
- 5S — a shadow board where a missing tool shows at a glance
- One-piece flow — one bike followed from station to station
- Cell — four stations in a U, worked by two operators
- Work in process — bikes piling up between stations that pass them on in lots of 5
- Kanban — three kinds of card, each one followed around its loop
- Delivery route — a tugger that swaps empty bins for full ones every 20 minutes
- Supermarket — rows of painted frames, each with a red flag at its reorder point
- Pull system — cards in blue, frames and bikes in green, on a gray floor
- Heijunka — a box at the dock with one card for every 10 minutes
- Pitch — takt time times a lot of 10, which is one lot every 10 minutes
- Changeover — the painter flushing the gun and swapping the paint pot
- Every part every interval — how often the booth comes back to each color
- Andon — a red light at a station, pulled by the operator
- Team leader — the person who walks over when the andon is pulled
- Lead time — one frame followed from paint to truck, with the waiting in red
- Value stream map — the whole plant on one page, redrawn as it changes
Questions
- What does this simulation show?
- An e-bike plant with a paint booth, a store of painted frames, four assembly stations, finished bikes and a truck every 30 minutes. It starts as a batch plant. Three switches change it: a flow cell, a timed delivery route and level pull. Each switch changes what happens on the floor and the numbers beside it.
- Does the simulation use real numbers?
- Yes. The shift is 440 minutes and dealers need 440 bikes, so takt time is 60 seconds. The four stations take 48, 52, 48 and 44 seconds when operators walk to a pallet and search it, and 26, 30, 28 and 26 seconds when the parts are at the station. Every number on screen comes from the running model.
- Why does the cell need 2 operators instead of 4?
- With parts at each station the work is 110 seconds a bike, plus 4 seconds of steps between stations. 114 divided by the 60-second takt time is 1.9, so 2 operators can do it when each works two stations. The cell on its own still needs 4, because walking and searching add 82 seconds. The timed route on its own also needs 4, because separate stations cannot share their spare seconds.
- What are the cards on the floor?
- They are kanban. A build card tells the cell which color to build. A paint card tells the paint booth which color a row of frames needs. An empty parts bin tells the tugger driver to bring a full one. Open Pull system or Kanban, pick a loop, and the camera follows one card around it.
- Can I use this to teach a class?
- Yes. It runs in the browser on a computer, a tablet or a phone, with no sign-up. Click an operator to open their standardized work combination table and work chart. Click the painter to open a process capacity sheet. Every term links to its written definition.